Seamless steel tube quality requirements

Seamless steel tube according to the standard is divided into ordinarynear standardnational standard three standardsSeamless steel tube needs to cover the pressure blue and the middle part of the sealing ring have certain standards.
The flange cover of these three standards are ordinary 6kg10kg near standard10kg national standardseamless steel tube must be based on the concrete floor of all the tube fixed position to stop reasonable equipmentand according to practice to indicate the location of all the tube location.
Seamless steel tube plugging in seamless steel tubein order to better avoid concrete into the coming inmust ensure the following aspects:
1After the installation of the beam casing in the concrete floor and column is carried out in cooperation with the civil engineeringflexible materials such as newspapers and embroidered pillows should be used to fill the concrete before pouring the concreteso as to avoid blocking caused by mortar entering the casing and wiring terminals.
2In order to avoid outdoor surface water or precipitation into the basement according to the seamless steel tubeit can ensure that the installation equipment has a good natural environment for engineering constructionThereforethe seamless steel tube out of the basement wall in addition to the selection of flexible material pluggingseamless steel tube prefabricated components production and processingshould be in the casing end number selection of thick steel plate welding welding pluggingto be opened when the seamless steel tube installation.
3The tubeline through the moisture-proof wallshould follow the structure embedded parts stiffness or soft seamless steel tube.
4The tube through the wallthrough the concrete floorthrough the flat roof should be embedded with the structure of the holeafter the construction of the construction project to carry out the casing layingthrough the wall embedded casing on both sides must be good sealing tape
5The tubes and U-shaped tubes at type I air defense concrete floor slabair defense wall and air defense diffusion chamber shall be sealed with embedded parts.
According to the user’s engineering need to take the corresponding production standardunder normal circumstances the flexible pressure on the seamless steel tube is limitedif under the condition of the engineering requirement according to strict standard is used to makeso for small engineering piping run basically won’t produce vibrationthe pressure generated by a medium for product posesYou can use the near standard or ordinary standard to makeso that you can play a large performance of the productwhile avoiding the waste of resourcesWhether using national standard or non-standard production of flexible seamless steel tubeare based on customer requirements and engineering demand for quality

Seamless steel tube according to the standard is divided into ordinarynear standardnational standard three standardsSeamless steel tube needs to cover the pressure blue and the middle part of the sealing ring have certain standards.
The flange cover of these three standards are ordinary 6kg10kg near standard10kg national standardseamless steel tube must be based on the concrete floor of all the tube fixed position to stop reasonable equipmentand according to practice to indicate the location of all the tube location.
Seamless steel tube plugging in seamless steel tubein order to better avoid concrete into the coming inmust ensure the following aspects:
1After the installation of the beam casing in the concrete floor and column is carried out in cooperation with the civil engineeringflexible materials such as newspapers and embroidered pillows should be used to fill the concrete before pouring the concreteso as to avoid blocking caused by mortar entering the casing and wiring terminals.
2In order to avoid outdoor surface water or precipitation into the basement according to the seamless steel tubeit can ensure that the installation equipment has a good natural environment for engineering constructionThereforethe seamless steel tube out of the basement wall in addition to the selection of flexible material pluggingseamless steel tube prefabricated components production and processingshould be in the casing end number selection of thick steel plate welding welding pluggingto be opened when the seamless steel tube installation.
3The tubeline through the moisture-proof wallshould follow the structure embedded parts stiffness or soft seamless steel tube.
4The tube through the wallthrough the concrete floorthrough the flat roof should be embedded with the structure of the holeafter the construction of the construction project to carry out the casing layingthrough the wall embedded casing on both sides must be good sealing tape
5The tubes and U-shaped tubes at type I air defense concrete floor slabair defense wall and air defense diffusion chamber shall be sealed with embedded parts.
According to the user’s engineering need to take the corresponding production standardunder normal circumstances the flexible pressure on the seamless steel tube is limitedif under the condition of the engineering requirement according to strict standard is used to makeso for small engineering piping run basically won’t produce vibrationthe pressure generated by a medium for product posesYou can use the near standard or ordinary standard to makeso that you can play a large performance of the productwhile avoiding the waste of resourcesWhether using national standard or non-standard production of flexible seamless steel tubeare based on customer requirements and engineering demand for quality


Post time: Jul-29-2022